There are several instructions that must be followed before performing waterproofing of bathrooms and kitchens using polyurethane materials and they are:



Non-installation of plumbing installations only after isolation work.

Installing ceramic walls, except for the last slab, can only be installed>

 

after insulation.

Flooring must have a smooth surface to receive waterproofing.

Linting on the doors of the bathrooms.

 

Work steps

 

Two layers of waterproofing polyurethane material of average thickness of 1.2 mm.

 

After insulation

 

Leave the insulation to dry completely.

Protect the insulation well with a soft layer or concrete.

 

Important note:

When any modifications to the isolated area are needed, which affects the isolation, please coordinate with Al-Zamil to take the necessary precautions